The era of the construction industry has advanced to a great extent. It is a team of multiple members who help complete the project successfully. Have anyone thought of the BIM coordinator’s work during construction? Why is there a need to hire them?
Also, how does it helps in defining the life-cycle of a building before the construction takes place? Well, for all such questions, the only response is to undertake Virtual BIM coordination services. In improving the overall structure and collaboration work, Virtual BIM coordination plays a massive role.
The article will discuss and explore a BIM coordinator’s key processes and workflow throughout the construction phase. The workflow is defined before, during, and after the construction phase. The team of skilled and expert BIM personnel uses established methods to resolve issues before construction occurs at the job site. It involves everyone associated with the project’s life.
Here let us understand how to utilize the BIM coordination technique to its most whole using different types of BIM tools and software. We will discuss how these processes and workflows help reduce labor costs, labor hours, material costs, and other expenses. It also helps increase the profitability ratio and reduce the chances of injuries and hazards in the industry.
Being a responsible BIM Coordinator
There are many variations that a BIM coordinator has in the construction industry. It is the responsibility of the BIM coordinator to ensure coordination between different teams associated with the building systems and the project. Complete coordination is done virtually and with proper coordination.
The complete process is entitled to the use of necessary software to help complete the clash-free and error-free project. As a BIM coordinator, their responsibilities define,
- We are verifying the project information as mentioned in the contract documents.
- The team works with contractors, sub-contractors, and detailers to coordinate with the system promptly.
- The group helps resolve issues and errors at the construction site that may occur during the work.
- Once the virtual construction work is complete, the team undertakes the work of creating the drawings that are approved for fabrication.
- The installation process only takes place after a thorough on-site verification at the job site.
- The BIM coordinator prepares a coordinated model to integrate the 7D BIM stage. It is related to the integration of facility management detailing.
These are some core responsibilities that a BIM coordinator undertakes during the project’s initial start. It is the process that, in the later stage, is meant for other project detailing also.
Use of Virtual BIM Coordination Service before Construction
The process of how virtual BIM coordination is utilized before the start of the construction includes a detailed understanding from the beginning of the project to its end. From deciding on the software to the use of it, all is the core requirement of the project.
The significant involvement of the BIM coordinator is seen during the preconstruction stage of the project. The BIM coordinator’s work is way ahead compared to the actual construction. They are the people who tend to find the issues in the project design way before its installation takes place.
Also, it is necessary to understand the type of contract the project is undergoing. Once this detail is known, the team can identify the differences and prepare the document for the following work. The standard contract details include:
- Design Detail Integration
- CMAR Detailing
- Build of Design
- Integrated Project Delivery
Preparation of Project with the use of Virtual BIM Coordination Services
Prepare the project detail with the use of virtual coordination, which includes a lot many processes. It undergoes reviewing the documents and the construction schedule. This set of documents is required for locating the subcontractor’s list. As a BIM contractor, it is necessary to know all the information related to the project. The initial stage of the project is getting started with the dirt! Yes, when we say earth, it means the land of the project where the ground of the project is located.
The team evaluates the complete building design, and with it, they verify the details as specified in the contract documents. It also includes all necessary specifications of the project along with the drawings that affect the coordination with the integration of MEP and FP systems.
Site Review
To start the project, it is necessary to have a complete site review. Thus, as a BIM coordinator, first, review the site with the team of engineers and, based on the site details, prepare the drawings and design of the building structure. The information is essential as it includes integrating architectural, structural, MEP, and other respective engineering work.
Architectural Engineering
The architectural engineering services include the core details of the project like,
- Types of walls and their sizes
- Wall locations
- Ceiling and Fixtures
- Chase Locations
- Sound Details and Area Dimensions
- Virtual verification of the drawings and design
- Contract document verification and reviews
Structural Engineering
The process of structural engineering services includes details like,
- Joists
- Steel Detailing
- Beams and Foundation Details
- Verification of steel joist profiles and trades to coordinate with them
- Review and Verify the contractor documents for final delivery of the project
MEP Engineering
The MEP engineering services undergo multiple levels of the staging of the work required in a construction project.
- Underground verification
- Electrical Conduit Fitting
- Ceiling layouts
- Support Systems
- Lighting and Electrical fixing
- Elevations
- Insulations Requirements
- Elevators Details
- Shop Drawings Submittals
- Fire Protection
- Fire Extinguisher Installation
The details mentioned above are the core requirements for the construction project. It is all undertaken with the use of necessary BIM software and techniques.
Process, Workflow, and Deadline of the Project
It is essential to understand the complete workflow of the project. Considering the aspect of the work, a BIM contractor defines the process and ensures meeting the project’s deadlines. It is required to initiate the project way before it’s started.
Virtual Coordination helps reduce cost and safety
The undertaking of virtual coordination in the project helps reduce the project’s cost and, with that, ensures safety precautions at the site. The BIM contractor adheres to the following necessary BIM tools and software and integrates the same based on the design and drawings. Also, the team of BIM engineers has a detailed checking of the project design and, based on that, shares the final project report.
The team with years of experience and expertise in using the technology knows when and how to mark up the details that help to work at the site, helping reduce the project’s cost, including its safety precautions.
For all this process, virtual coordination services are necessary before the start of the construction project, as this is the project’s base.
Final Words
The article we shared delivers the necessary information about the project and how it is data-driven and worth undertaking. With the help of BIM coordination services, the modeler creates and design the model with proven track records and good collaboration and coordination.
Similarly, there are a lot many other aspects that play an essential role in the construction industry. AEC industries across the globe are looking for options in the market that make their work faster and simpler. Virtual Construction is one of the best processes taken into consideration before the start of the project. If following all the steps mentioned above, the project’s outcome will be way better than expected.